Deposits for all three 2027 trips are due January 16, 2027 — and there is always grace.
The 17th Annual Mt. Kilimanjaro Clean Water Climb

Three climbs. One purpose.

In 2027 there are three ways to stand on the roof of Africa (19,341') and leave something behind that outlasts the photos: repaired water wells serving villages in rural Malawi. Every trip follows the Prairie–Peak–Purpose arc — safari on the Tanzanian plains, the ascent, then two days in Malawi where wells your fundraising repaired come back to life in front of you.

"You will never know your true potential unless you leave your comfort zone."— Dr. Buumba Bubala, Zambia

Mike takes no fees for leading these trips — he is fully self-funded. Every dollar you raise goes to well repair through Child Legacy International (EIN 93-4081451). Kilimanjaro is a non-technical climb: no ropes, no prior mountaineering. What it asks for is fitness and heart.

Trip 1 — The Classic · Jun 19 – Jul 7, 2027 (19 days)

~$5,525 + airfare · $1,900 deposit by Jan 16, 2027. Full safari (Tarangire and the Ngorongoro Crater — where the 2025 team saw the Big Five in a single day), the 8-day Lemosho Route (the most beautiful line up the mountain, with the best acclimatization), then Malawi.

PartDatesWhat happens
FlightsJun 19–20Houston (IAH) → Kilimanjaro (JRO), overnight flight
PrairieJun 21–23Tarangire NP and Ngorongoro Crater safaris; drive to Moshi via Lake Manyara; pack for the hike
PeakJun 24–Jul 18-day Lemosho Route: Mti Mkubwa → Shira 1 → Moir → Lava Tower & Barranco → Karanga → Kosovo Camp → midnight summit push to the Crater Ash Pit and glaciers → celebrate at Mweka Gate
FlightsJul 2–3JRO → Dar es Salaam → Lilongwe, Malawi; settle in, possible short project tour
PurposeJul 4–5Rest day, church, and Malawi project tour; then hands-on water well repairs and Bible stories with the villages your climb serves
HomeJul 6–7Lilongwe → Istanbul → Houston

Options: skip Malawi and fly home after the climb (15 days) — though including Malawi is highly recommended; it's the part climbers call life-changing. Add extra days at Child Legacy (~$125/day).

Start with a dinner   Ask Mike about Trip 1

Trip 2 — The Compact · Jul 7 – Jul 22, 2027 (16 days)

~$4,105 + airfare · $760 deposit by Jan 16, 2027. A shorter itinerary and a lower cost, with a different warm-up: Arusha National Park and an acclimatization hike on Mt. Meru before a 6-day Shira Route ascent.

PartDatesWhat happens
FlightsJul 7–8Houston (IAH) → Kilimanjaro (JRO), overnight flight
PrairieJul 9–10Full-day Arusha NP safari; Mt. Meru acclimatization hike to Miriakamba Hut; pack for Kili
PeakJul 11–166-day Shira Route: Moir Camp or Shira II → Lava Tower & Barranco → Karanga → Kosovo Camp → summit to the Crater Ash Pit and glaciers → out at Mweka Gate
FlightsJul 17–18JRO → Nairobi → Lilongwe, Malawi
PurposeJul 19–20Malawi church and project tour; water well repairs and Bible stories
HomeJul 21–22Lilongwe → Istanbul → Houston

Options: skip Malawi (12 days); add Child Legacy days (~$125/day).

Start with a dinner   Ask Mike about Trip 2

Trip 3 — Dry Season · Sep 4 – Sep 22, 2027 (19 days)

~$5,525 + airfare · $1,900 deposit by Jan 16, 2027. The same beloved shape as Trip 1 — full safari and the 8-day Lemosho Route — in Kilimanjaro's clear September window, with flights routed through Istanbul both ways.

PartDatesWhat happens
FlightsSep 4–6Houston → Istanbul → Kilimanjaro (JRO)
PrairieSep 6–8Tarangire NP and Ngorongoro Crater safaris; drive to Moshi
PeakSep 9–168-day Lemosho Route to the summit, Crater Ash Pit, and glaciers; out at Mweka Gate
FlightsSep 17–18JRO → Dar es Salaam → Lilongwe, Malawi
PurposeSep 19–20Rest day, church, project tour; water well repairs and Bible stories
HomeSep 21–22Lilongwe → Istanbul → Houston

Options: skip Malawi (15 days); add Child Legacy days (~$125/day).

Start with a dinner   Ask Mike about Trip 3

Good to know

Not sure which trip is yours?

That's exactly what the dinners are for.

RSVP for an info dinner in The Woodlands
DEMO PREVIEW — built for Mike by Brandon · not the live site · itineraries & pricing from Mike's 2027 flyer